Ashley Valley WTP Chain & Flight Replacement
Ashley Valley · Uintah County
- Contract Value
- $0.6M
- North & South Chain Replacement
- 2 Basins
- Location
- Ashley Valley
- County
- Uintah County
- Year
- 2018
- Status
- Complete
- Client / Owner
- CUWCD / Brown & Caldwell
Project Overview
VanCon demolished the deteriorated chain & flight mechanisms in both the North and South Basins and installed new devices which included shafts, chains & flights, motors & drives, return rails, installation and start-up of electrical and instrumentation. Existing handrails were modified and permanent ladders were added. Instrumentation, controls and weather shields were installed. CM/GC additions included an extra stainless-steel platform with a retractable ladder to improve basin access, and a baffle to protect the polymer sludge rakes from being destroyed by influent water.
Project Highlights
- Chain & flight mechanism demolition and replacement in North and South Basins
- New shafts, chains & flights, motors & drives, return rails
- Electrical and instrumentation installation and start-up
- Handrail modifications and permanent ladder additions
- Instrumentation, controls, and weather shields installed
- CM/GC: stainless-steel platform with retractable ladder added
- CM/GC: baffle added to protect polymer sludge rakes
Related Projects
Salem WRF
CompleteSalem · Utah County · 2022
VanCon built a new wastewater reclamation facility with an operations building, a maintenance building, an electrical building, an influent pump station with mechanical and bypass bar racks, a headworks building with washer/compactor, grit classifier, and grit chambers, an anaerobic pre-selector with RAS pumps, a three-ring Orbal ditch, clarifiers, a process building with UV open channel disinfection, screw press, and alum feed systems, WAS pumps, a solids storage tank, odor control, and combustible gas monitoring. The water table onsite was 3 feet deep — vaults 15 to 20 feet deep required continual dewatering throughout the project.
Contract Value
$16.3M
Full WRF New Construction
3-Ring Orbal
View Project →
Springdale WTP
CompleteSpringdale · Washington County · 2018
VanCon removed the existing chemical room, chlorine room, and clearwell, and constructed a new water treatment plant with meter and control valve vault, office building, CMU block wall, and generator reinstallation.
Contract Value
$4.5M
Water Treatment Plant
Full Replacement
View Project →
Eagle Mountain WWTP Headworks
CompleteEagle Mountain · Utah County · 2024
VanCon built a new headworks building and flow meter vault in an existing facility and installed influent screens, grit washing and removal equipment, a grit pump, slide gates, and connections to existing piping to divert influent lift station through the headworks building before supplying the ox ditch. VanCon's fabrication shop made the interior and exterior steel staircases and handrail and the channel supports and plates for the electrical room.
Contract Value
$4.0M
Grit Removal & Influent Screens
New Headworks
View Project →