Treatment Facility

Springdale WTP

Springdale · Washington County

Contract Value
$4.5M
Water Treatment Plant
Full Replacement
Location
Springdale
County
Washington County
Year
2018
Status
Complete
Client / Owner
Town of Springdale / Sunrise Engineering
Springdale WTP photo 1
Springdale WTP photo 2
Springdale WTP photo 3

Project Overview

VanCon removed the existing chemical room, chlorine room, and clearwell, and constructed a new water treatment plant with meter and control valve vault, office building, CMU block wall, and generator reinstallation.

Project Highlights

  • Existing chemical room, chlorine room, and clearwell removed
  • New water treatment plant constructed
  • Meter and control valve vault installed
  • Office building constructed
  • CMU block wall built
  • Generator reinstallation completed

Related Projects

Ashley Valley WTP Chain & Flight Replacement
Treatment

Ashley Valley WTP Chain & Flight Replacement

Complete

Ashley Valley · Uintah County · 2018

VanCon demolished the deteriorated chain & flight mechanisms in both the North and South Basins and installed new devices which included shafts, chains & flights, motors & drives, return rails, installation and start-up of electrical and instrumentation. Existing handrails were modified and permanent ladders were added. Instrumentation, controls and weather shields were installed. CM/GC additions included an extra stainless-steel platform with a retractable ladder to improve basin access, and a baffle to protect the polymer sludge rakes from being destroyed by influent water.

Contract Value

$0.6M

North & South Chain Replacement

2 Basins

View Project →

Salem WRF
Treatment

Salem WRF

Complete

Salem · Utah County · 2022

VanCon built a new wastewater reclamation facility with an operations building, a maintenance building, an electrical building, an influent pump station with mechanical and bypass bar racks, a headworks building with washer/compactor, grit classifier, and grit chambers, an anaerobic pre-selector with RAS pumps, a three-ring Orbal ditch, clarifiers, a process building with UV open channel disinfection, screw press, and alum feed systems, WAS pumps, a solids storage tank, odor control, and combustible gas monitoring. The water table onsite was 3 feet deep — vaults 15 to 20 feet deep required continual dewatering throughout the project.

Contract Value

$16.3M

Full WRF New Construction

3-Ring Orbal

View Project →

Eagle Mountain WWTP Headworks
Treatment

Eagle Mountain WWTP Headworks

Complete

Eagle Mountain · Utah County · 2024

VanCon built a new headworks building and flow meter vault in an existing facility and installed influent screens, grit washing and removal equipment, a grit pump, slide gates, and connections to existing piping to divert influent lift station through the headworks building before supplying the ox ditch. VanCon's fabrication shop made the interior and exterior steel staircases and handrail and the channel supports and plates for the electrical room.

Contract Value

$4.0M

Grit Removal & Influent Screens

New Headworks

View Project →