Sedimentation Basin Improvements
Bluffdale · Salt Lake County
- Contract Value
- $20.7M
- Sedimentation Basin Upgrades
- 6 Basins
- Location
- Bluffdale
- County
- Salt Lake County
- Year
- 2023
- Status
- Complete
- Client / Owner
- Jordan Valley Water Improvement District / Brown & Caldwell
Project Overview
VanCon remodeled existing structures to increase the capacity and prolong the life of the Bluffdale water treatment sedimentation basins. VanCon removed deteriorated chain and flight and poured seismic reinforcing concrete walls inside two basins and two buttresses outside the basins. VanCon infilled around the troughs through the effluent wall of four basins. VanCon repaired clarifiers for basins 1 and 2. VanCon installed new chain and flight and replaced pumps for six basins. The work took place through an unexpectedly extra snowy winter, requiring ice chipping and snow removal almost daily.
Project Highlights
- Seismic reinforcing concrete walls in two basins
- Two exterior buttresses poured
- Deteriorated chain and flight removal and replacement
- Effluent wall trough infill on four basins
- Clarifier repair for basins 1 and 2
- Pump replacement for six basins
- Winter construction — daily ice chipping and snow removal
Related Projects
Ashley Valley WTP Chain & Flight Replacement
CompleteAshley Valley · Uintah County · 2018
VanCon demolished the deteriorated chain & flight mechanisms in both the North and South Basins and installed new devices which included shafts, chains & flights, motors & drives, return rails, installation and start-up of electrical and instrumentation. Existing handrails were modified and permanent ladders were added. Instrumentation, controls and weather shields were installed. CM/GC additions included an extra stainless-steel platform with a retractable ladder to improve basin access, and a baffle to protect the polymer sludge rakes from being destroyed by influent water.
Contract Value
$0.6M
North & South Chain Replacement
2 Basins
View Project →
Salem WRF
CompleteSalem · Utah County · 2022
VanCon built a new wastewater reclamation facility with an operations building, a maintenance building, an electrical building, an influent pump station with mechanical and bypass bar racks, a headworks building with washer/compactor, grit classifier, and grit chambers, an anaerobic pre-selector with RAS pumps, a three-ring Orbal ditch, clarifiers, a process building with UV open channel disinfection, screw press, and alum feed systems, WAS pumps, a solids storage tank, odor control, and combustible gas monitoring. The water table onsite was 3 feet deep — vaults 15 to 20 feet deep required continual dewatering throughout the project.
Contract Value
$16.3M
Full WRF New Construction
3-Ring Orbal
View Project →
Springdale WTP
CompleteSpringdale · Washington County · 2018
VanCon removed the existing chemical room, chlorine room, and clearwell, and constructed a new water treatment plant with meter and control valve vault, office building, CMU block wall, and generator reinstallation.
Contract Value
$4.5M
Water Treatment Plant
Full Replacement
View Project →